Eligible
State Cost-Share BMPs | DCR SPEC. # | Installed
Units | State Rate |
1. | Reforestation of Erodible Crop and Pasture land | FR-1 | Acre | $175/Ac. for pines $250/Ac. for Hardwoods |
2. | Woodland Buffer Filter Area | FR-3 | Acre | $200/Ac. for pines $275 for Hardwoods |
3. | Woodland Erosion Stabilization | FR-4 | Acre | 75% |
4. | Livestock Exclusion with Reduced Set Back (Southern Rivers Only) | LE-2 | Lin. Feet of stream bank protected | 50% |
5. | Long Term Continuous No Till Planting Systems | LT-CNT | Acre | $50/acre |
6. | Three
Year Contract for Nutrient Management Plan Writing and Revisions | NM-1
| Acre | $2 Annually
($6/acre Contract) for Commercial $4/ac. Annually ($12/acre Contract) for on-farm manure |
7. | Three Year Contract for Nutrient Management
Plan Implementation and Record Keeping | NM-2 | Acre | $5/ac. Annually ($15/ac. Contract)
|
8. | Sidedress Application
of Nitrogen on Corn | NM-3 | Acre | 75% up to $6/Acre $8/Sample
|
9. | Organic Nutrient
Application to Corn using Pre-Sidedress Nitrate Test to Determine Need for Sidedress Nitrogen | NM-3B | Acre | 75% up to $6/Acre $8/Sample |
10.
| Late Winter Split Application of Nitrogen on Small Grain | NM-4 | Acre | 75% up to $4.50/Acre $8/Sample |
11. | Vegetative Stabilization of Marsh Fringe Area | SE-1 | Acre | 50% |
12. | Permanent Vegetative Cover Establishment On Cropland | SL-1
| Acre | $25/
Ac plus $5/Ac for each year up to 10 plus 75% of component cost |
13.
| Strip-cropping System | SL-3
| Acre | $30/Ac
+75% of the eligible component cost |
14. | Buffer Stripcropping | SL-3B | Acre | $15/Ac |
15. | Terrace Systems | SL-4 | Linear Feet | 75% |
16. | Diversions
| SL-5 | Linear
Feet | 75% |
17.
| Grazing Land Protection | SL-6
| Linear Feet of Stream bank protected | 75% |
18. | VACS
Support for Extension of CREP Watering System | SL-7 | Acreage of rotational grazing implemented | 75%,
but Not To Exceed a fixed amount based upon the acreage or width of the CREP Buffer |
19. | Protective Cover for Specialty Cropland | SL-8 | Acre | $35/Ac |
20. | Small Grain Cover Crop for Nutrient Management | SL-8B
| Acre | $25/Acre,
and $25/Acre early bonus, and $10/Acre select rye varieties bonus |
21. | Harvestable Cover Crop | SL-8H | Acre | $25/Acre |
22. | Permanent Vegetative Cover on Critical Areas | SL-11
| Acre | 75% |
23. | Continuous No-till System | SL-15A | Acres | $100/Acre |
24. | Continuous No-till Forage Production System | SL-15B
| Acres | $50/Acre
|
25. | Sediment Retention,
Erosion or Water Control Structure | WP-1 | # of Structures | 75% |
26. | Stream Protection | WP-2 | Linear Feet of Stream bank protected | 75% |
27. | Stream bank Stabilization | WP-2A | Linear Feet of Stream bank protected | 75%
|
28. | Sod Waterways
| WP-3 | Acres
in Waterway | 75% |
29.
| Animal Waste Control Facilities | WP-4
| # of Systems | 75%
|
30. | Loafing Lot Management
System | WP-4B | #
of Systems | 75% |
31.
| Composting Facilities | WP-4C
| # of Systems | 75%
|
32. | Animal Mortality
Incinerator Facility | WP-4F | # of Systems | 75% |
33. | Agricultural Chemical Handling Facility | WP-6 | # of Structures | 75% |
34. | Grass Filter Strips | WQ-1 | Acre | $175/Acre |
35. | Legume Cover Crop | WQ-4 | Acre | $35/Acre |
36. | Water Table Control Structure | WQ-5 | Acre | 75% |
37. | Agricultural Sinkhole Protection | WQ-11 | Acre | 75% for protection 75% for clean out not to exceed $4,000
|